SDOT Thornton Creek Bridges Study Open House FEB27

SDOT Thornton Creek Bridges Study Open House FEB27

The Thornton Creek Bridges Study has explored rehabilitation and replacement options for four bridges in the Meadowbrook neighborhood at: NE 110th St., 39th Ave Ne, NE 105th St. near 39th Ave Ne, and NE 95th St. near Sand Point Way. The study intends to identify solutions that included long term multi-modal transportation demands for biking, walking, driving, and mass transit.

Thornton Creek Natural Drainage System Project

Thornton Creek Natural Drainage System Project

Thornton Creek Natural Drainage System Project click to download (pdf) SPU is working on a project to install natural drainage systems in the Thornton Creek basin. These systems consist of shallow depressions in the public right-of-way, or “planter strip,” filled with...